Get in touch

Technology

Open standards, not a walled garden.

You don't need to be technical to work with us — but if you like to know how things work (or your electrician wants the detail), it's all here. Plain English first, full spec sheet further down.

The short version

What it means for you, without the jargon

Three things worth knowing, whether or not you ever look at a spec sheet.

Charging speeds, in plain terms

"Fast" means different things depending on the charger

7kW · Trickle

Good for overnight

Plug in at close of business, ready by morning. The most common speed for offices and staff car parks.

22kW · Standard

A working day's charge

Tops up a car fully across a typical shift or a hotel guest's stay.

50–150kW · Rapid

A lunch-break top-up

Meaningful range added in 30–45 minutes — the level most retail and leisure sites choose.

150–350kW · Ultra-rapid

A coffee-break top-up

The fastest speed available today — most of a battery in the time it takes to grab a coffee.

For your electrician or facilities team

The full spec sheet

SpecDetail
ConnectorsType 2 (AC), CCS2 (DC rapid/ultra-rapid)
Power bands7kW · 22kW · 50kW · 150kW · 350kW
Wiring & installationBS 7671:2018 (Section 722)
Communication protocolOCPP 1.6J / 2.0.1
PaymentContactless (Public Charge Point Regs 2023), RFID, app
Grid connection applicationG98 / G99, submitted to your local DNO
Reliability benchmark99% uptime (rapid chargers, per PCPR 2023)
AccessibilityPAS 1899:2022-aligned installation

Load management

Think of it as a smart traffic system for electricity

Rather than each charger grabbing power for itself, our software constantly shares out what your site actually has available — a bit like traffic lights keeping several lanes moving without a jam. In technical terms: dynamic load management balances demand across every connected charger in real time, so a site can run more bays than its raw supply would normally allow, automatically staying within your connection agreement.

Grid connections

The paperwork nobody wants to do — we do it

Every site needs sign-off from the company that owns the local power lines (your Distribution Network Operator, or DNO). That means a form — either a G98 or G99 application, depending on how much power you need — plus any upgrade works if your existing supply isn't enough. We submit it, chase it, and give you a realistic timeline rather than a hopeful one.

Monitoring

Every bay, watched in real time

Uptime

We usually know before you do

Every charger reports its status continuously, and faults are picked up by our team before anyone thinks to complain.

Reporting

See what's actually happening

Usage and energy data live in a simple dashboard, or flow straight into your own systems if you'd rather.

Compliance

Sorted, quietly

Every install meets Building Regs Part S and your DNO's requirements from day one — nothing for you to chase later.

A few more questions

Do I need to replace chargers I already have?

Not necessarily. Because everything runs on OCPP, existing OCPP-compatible hardware can often be brought into the same monitoring and load management system rather than ripped out.

What if I already have a preferred hardware brand?

That's fine — open standards mean we're not tied to one manufacturer either. Tell us your preference and we'll work around it where it makes sense.

Could my site's existing wiring be a blocker?

Occasionally, yes — older buildings sometimes need electrical upgrades before a charger can go in safely. That's exactly what the site visit is for: we'd rather flag it on day one than have it surprise you later.

Got a technical question?

Send us your site's supply details and we'll come back with a straight, honest feasibility view.

Talk to the team